So the last two days I've been watching the contractor cut my floor, tear apart the yard and lay concrete where it's well needed. The rain this year has made the ground around the house a marsh. The side of the house was starting to get tire marks from going back and fourth to get to the back garage.
Also with the new lift the floor was really un-even. To solve the problem I had a 7'x12' rectangle cut out of the garage. This will give me enough room to put the post and still have room to swing the arms without worrying about the ground next to it being to high.
Link to the slideshow:
http://smg.photobucket.com/albums/v637/Boozshey/109/concrete/?albumview=slideshow
Some highlights...
Also with the new lift the floor was really un-even. To solve the problem I had a 7'x12' rectangle cut out of the garage. This will give me enough room to put the post and still have room to swing the arms without worrying about the ground next to it being to high.
Link to the slideshow:
http://smg.photobucket.com/albums/v637/Boozshey/109/concrete/?albumview=slideshow
Some highlights...