Right I got a lot of little things done
2011 gas pedal, mirror, fuel pumps, and then cut and solder all the old connectors to the new harness. Still need to do tailights. Getting closer still new ac heat box and then install dash but getting closer





New heater/ac box is in and went ahead and ordered mb Quartz front and rear speakers and kickers 8" door speakers


2011 gas pedal, mirror, fuel pumps, and then cut and solder all the old connectors to the new harness. Still need to do tailights. Getting closer still new ac heat box and then install dash but getting closer





New heater/ac box is in and went ahead and ordered mb Quartz front and rear speakers and kickers 8" door speakers


Last edited by a moderator:



















