This morning I made myself a list for the day.
1. Skim coat kitchen drywall
2. Grade out the dirt in the back yard.
3. Final coat of paint in the bathroom (where I skimmed over some bad spots).
By 10:30 I finished 2 of the three. Should be able to paint the bathroom as well as sand and paint the kitchen this afternoon.
All that crap on the back porch will eventually go in the garage once I finish the dividing wall. I need to get on that soon as well, probably right after I finish the kitchen.
1. Skim coat kitchen drywall
2. Grade out the dirt in the back yard.
3. Final coat of paint in the bathroom (where I skimmed over some bad spots).
By 10:30 I finished 2 of the three. Should be able to paint the bathroom as well as sand and paint the kitchen this afternoon.
All that crap on the back porch will eventually go in the garage once I finish the dividing wall. I need to get on that soon as well, probably right after I finish the kitchen.