Looking good, I bet you all can't wait to move in.
Thanks Zman .... and no, we both can't wait to finally live there ... it's been over 8 months since I bought this place, the renovation has taken much longer than we thought it would, I kinda wish I paid a contractor to just do everything instead of doing most of it ourselves.
But whatever, we're almost done.
Today I painted the small bedroom, the last room that hadn't been painted yet.
I also cleaned out the front bedroom, vacuumed it and opened up a bunch of boxes of hardwood, setting the wood down on the floor so it can better acclimate to the house - the installation is set to resume tomorrow when my bro-in-law returns with his 2 nailing guns.
The GF and I took a short trip today and bought 12 16' baseboard trim pieces, then we ripped them to get rid of a bit of Colonial-style detail they had, so now they're just rectangular trim, to be used for the doors.
I also removed the 2 hand rails that were attached to the walls on the sides of the stairs heading to the basement, and filled-in the holes/damage left behind with joint compound.
I scheduled the fridge and chest freezer delivery for early next week, and the Cat5 cable install is scheduled for next week Thursday.
Yes, we're going with Cat5 cable after all.
We have fiber optic coming into the house, we'll have Cat5 going to each of the 3 bedrooms, to the living room, and to the sun room where a small TV will be wall-mounted.