Started today with putting on the second coat of paint on the ceiling in the third bedroom and the kitchen, and putting in the recessed LED light assemblies.
I then went back to the wood shop where the rest of the kitchen cabinets are, finished cutting/gluing/sanding the veneer pieces that will be the visible finished ends on the cabinets (the shop owner is spraying them for us - he's doing a great job), brought home the sprayed/finished drawer fronts and most of the cabinet doors, went back to working on the kitchen, primed the 2 opposing walls that will be red with the required gray primer, and cut-in and painted the other 2 walls with the same taupe paint that we used in the sun room:
(the bare areas will be covered by cabinets, so no need to waste paint)
I then went back to the wood shop where the rest of the kitchen cabinets are, finished cutting/gluing/sanding the veneer pieces that will be the visible finished ends on the cabinets (the shop owner is spraying them for us - he's doing a great job), brought home the sprayed/finished drawer fronts and most of the cabinet doors, went back to working on the kitchen, primed the 2 opposing walls that will be red with the required gray primer, and cut-in and painted the other 2 walls with the same taupe paint that we used in the sun room:
(the bare areas will be covered by cabinets, so no need to waste paint)
