Ok, finished the fuel cell mounting today, along with the sheet aluminum. Here is a pic of the final mock up before I put the sheet aluminum on.
Now with the aluminum in place, now it was time to bolt everything in place for the last time. I have to screw down the perimeter with sheet metal screws also.
Here is what everything looks like underneath. Everything is still dirty, I need to clean up everything with some SOS pads. You can see the sump of the fuel cell goes through the aluminum floor, and you can also see the bolts I have that go from the L brackets through the frame rails. This thing will not go anywhere. It is rock solid.
Here you can see the fuel pump mounting bracket. This is where I am going to mount the A2000 Aeromotive pump and filter. I will be routing the return and vent through the sheet aluminum via bulkhead fittings. I will also have a Y block that will let both outlets drain into the #10 line to the inlet of the fuel filter, then pump.
Next weekend I will have the entire fuel system in place, the vent, return, fuel lines, fuel filter and fuel pump. Everything else will be cleaned up and it should look pretty nice.