Friday was mostly a detail day. The wood floor installer came back to install the 1/4-round trim. To be honest, I think I could have done a better job. I also selected a company to do the garage floor epoxy coating. That work will start on Sept 14. In the back yard, some grading was done and a few forms were set for the flatwork concrete.
The big item on the schedule for next week is the granite countertops will be going in!
Countdown to Move In: 19 days
It’s hard to see, but the dirt has been graded for the flatwork.
Cabinet/Floor trim.
Friday was mostly a detail day. The wood floor installer came back to install the 1/4-round trim. To be honest, I think I could have done a better job. I also selected a company to do the garage floor epoxy coating. That work will start on Sept 14. In the back yard, some grading was done and a few forms were set for the flatwork concrete.
The big item on the schedule for next week is the granite countertops will be going in!
Countdown to Move In: 19 days
It’s hard to see, but the dirt has been graded for the flatwork.
Cabinet/Floor trim.