Try going from Texas to Bristol, Tennessee for a race. Leave there Sunday night and drive to Baltimore. Leave the rig in long term airport parking at the Baltimore airport so you can fly back to Texas for work. Work Tuesday through Thursday (12 hour days so your paycheck doesn't suck) then fly back to Baltimore on Thursday night. Drive from Baltimore to Atco, New Jersey for a race. Leave NJ Sunday night and drive to Epping, New Hampshire. Drop the trailer at the track for safekeeping then drive the truck back to Boston. Leave the truck in airport parking in Boston and fly back to Texas for work. Work Tuesday through Thursday (again...12 hour days) then fly back to Boston on Thursday night. Pick up the truck and head to Epping for the race. Leave Epping Monday morning and drive back to Texas.
Tennessee.....won the race.
Atco.....flooded out after round one.
Epping....runner up but clinched World Championship.
Profit/Loss: $1190 in the negative even with the winner & runner-up checks and contingency money.
That's what it takes, kid.